Validation¶
Test case 1: XXXXXX¶
The purpose of this example is to estimate the risk…
1- Problem statement¶
a- Inputs¶
Stochastics variables:
Name |
Description |
Distribution |
---|---|---|
Q |
A1 |
Normal(10200, 100) |
E |
A2 |
Normal(3000, 15) |
C |
C1 |
Normal(4000, 60) |
Deterministic independent variables:
Variable |
Description |
Value |
---|---|---|
t |
Loss rate |
0.05 |
Nelec |
Reference efficiency |
0.54 |
Nth |
Reference efficiency |
0.8 |
b- Output¶
Primary energy savings
2- Deterministic parametric analysis¶
a- Inputs¶
Variable |
Min |
Max |
Step |
---|---|---|---|
Q |
10033.1 |
10364.6 |
100 |
E |
2975 |
3024.99 |
15 |
C |
3901.33 |
4097.74 |
60 |
b- Results¶
Q |
E |
C |
Ep |
---|---|---|---|
10030 |
2975 |
3900 |
0.06035 |
10365 |
2995 |
4100 |
0.05456 |